Project: Large-Scale landfill Liner Installation – 22,000 m²
Location: Alberta, Canada
Scope of Work
Canadian Erosion & Containment (CEC) delivered a comprehensive liner installation solution for a major industrial containment project, covering 22,000 m². The work included:
• GCL Liner Installation
Installed Geosynthetic Clay Liner (GCL) for superior hydraulic barrier performance and long-term seepage control.
• HDPE Liner Installation
Applied High-Density Polyethylene (HDPE) liner for exceptional chemical resistance and structural integrity, ensuring compliance with environmental regulations.
• Geocomposite Liner Installation
Integrated Geocomposite liners to enhance drainage and filtration, optimizing site sustainability and performance.
Key Highlights
• Large-scale installation completed on time and within budget
• Advanced containment solutions for oil & gas and industrial applications
• Commitment to environmental protection and regulatory compliance