Project Overview: MSE Wall Installation

Our team successfully completed the installation of a Mechanically Stabilized Earth (MSE) wall system, delivering a robust and engineered solution tailored to project specifications. The scope included:

  • Mobilization and Demobilization of the wall system.

  • Retaining Wall Installation:

    • CWA08: 775 m² installed.

    • CWA10: 425 m³ installed.

  • Backfill Installation:

    • 100 m³ placed for structural integrity.

  • Supply and Delivery:

    • 1,200 m² of MSE components, including:

      • Tensar Galvanized WWF baskets with struts.

      • TPG geogrid reinforcement.

      • 8 oz woven geotextile.

  • Engineering Support:

    • Stamped shop drawings provided to meet all contract specifications.