Vegetated MSE wall Sierra Slope
1000/m2 Vegetated MSE wall Sierra Slope and 22,000/m2 of wall backfill installation
Coastal Gas link Hydromulching project 1.2 million m2 of Flexterra
Coastal Gas link Hydromulching project 1.2 million m2 of Flexterra
CEC supplied and backfilled 10,740/m3 Des 2 Crush,175/m3
CEC supplied and Backfilled – Crushed Granular – Des 2, CI 10,740 m3 Backfill – Crushed Aggregate – Des 2, CI 25 175 m3 Backfill – Crushed
Cec supplied and installed 1,500/m2 of Terrawall
Cec supplied and installed 1,500/m2 of Terrawall and reinforced backfill zone of 2500/m3 of clay
CEC Supply and Install 1800/m2 Load n Lock MSE Wall Face
CEC Supply and Install 1800/m2 Load n Lock MSE Wall Face and backfilled 2000/m3 gravel and clay
Cranston Riverstone project precast panel wall system with 56 soldier piles 880mm
CEC Designed, supplied and install 514/m2 of Precast panel wall system with 56 soldier piles 880mm
Terrasteep 90 MSE Wall System
CEC supplied and install 916/m2 of Terrasteep 90 mse wall system