Projects
Project Highlights
See below for a selection of recent work that CEC has completed.

Supply and Install of 71,000 /m2 SRNWL Geosynthetic Clay Liners

Supply and install of a 7,000/m2 NWL GCl Pond

Supply and installation of a 32,000/m2 NS GCL pond



Supply and Install of two water storage pits

20 ha supply and install of proganics with promatrix erosion control .

325 km of stockpile stabilization pipeline right-away

Supply and Installation of 4,200/m2 40 mil LLDPE Fresh water pond
Sierrascape wall Install

Supply and Install of Alan Block Retaining wall system




Calgary, Alberta
2017
Installation of a 80m x 5m x 2.5m cultec stormwater chamber.

LLDPE liner and cultec system

supply and installation of over 100,000/m2 of Grid and Fabric

Installation of 100,000/m2 of hydro-mulch on Alberta county roads at 1800/kg to ha

Installation of 100,00/m2 of ECO Anchor
10 ha of proganics and promatrix applied directly on clay with great success .

Flexterra slope stabilization

Supply and installation of 10,000/m2 of Hydro-mulch
Project Name :Anderson Road Client: Volker Stevin

30,000 /m2 supply and install of CEC Radon system