RDEK Landfill Expansion Project

Canadian Erosion and Containment Ltd (CEC) was selected to supply and install advanced containment systems for the Central Landfill Expansion, ensuring environmental protection and regulatory compliance for the site.

Scope of Work

  • Three-Liner System Construction

    • Installation of owner-supplied geosynthetic clay liner (secondary barrier)

    • Installation of owner-supplied 60mil HDPE geomembrane liner (primary barrier)

    • Placement of 12 oz. non-woven geotextile (cushion/separation layer)

    • Pipe boot penetrations for secure liner integration

  • Leachate Conveyance System

    • Installation of 300mm HDPE solid leachate conveyance pipe from manhole to pond discharge

    • Pipe cleanouts for system maintenance

Project Highlights

  • Over 15,500 m² of liner system installed for robust environmental containment

  • Precision installation on approved, obstruction-free subgrade

  • Efficient scheduling and mobilization for timely project delivery

  • Strict adherence to safety, weather, and quality standards

Client Support

CEC provided skilled technicians and specialized equipment, working closely with the general contractor to ensure seamless installation and site readiness. The team’s expertise in geosynthetics and landfill systems made CEC the clear choice for clean runoff and long-term site protection.

.CEC’s installation crew welded and placed HDPE pipe sections for the landfill’s drainage system, making sure everything was secure and lined up for reliable performance.

Installation of 300mm HDPE solid leachate conveyance pipe from manhole to pond discharge

For the GCL, CEC places the clay liner panels over a prepared base, joining them together to cover the area as needed. The goal is to create a reliable barrier that helps keep liquids from getting into the ground.

Geosynthetic clay liner (secondary barrier)

15,000 Square meters 60 mil HDPE liners, geotextiles, CEC rolls out and welds HDPE geomembrane sheets to form a solid, waterproof layer. This liner acts as the main defense against leaks, protecting the environment and meeting project requirements.

60mil HDPE geomembrane liner (primary barrier)

Previous